2016年2月29日星期一

Concrete mixer truck safety rules

Cement plant components:
A concrete mixer truck automobiles car part should implement the provisions of the general safety technical requirements. Second, concrete mixing vehicles transporting fuel, lubricating oil, hydraulic oil, brake fluid, cooling water should be added sufficient quality should meet the requirements.

Third, the power output apparatus should be checked and confirmed that no loose bolts and bearing oil spills and other phenomena. Fourth, the stirring transport, loading of the concrete should not exceed the rated capacity. Fifth, before starting mixer, mixing tube should be operating handle on the "stop" position
Sixth, before mixing trucks loading, mixing tube should be first inverted so that water and debris barrel drained. Seven, when the charge should be a joystick on the "charge" position, and adjust the speed of the mixing tube, the feed smoothly.
Eight concrete during transport, make sure slide hopper placed firmly to prevent loosening caused by swing, injuring pedestrians or affect the normal operation of other vehicles in the road.
Nine, shipped Mixed Concrete, mixing tube speed of 2-10 rev / min, during transport, stirring drum speed on a flat road surface guarantees 2-3 rev / min, with slopes greater than 50 in the roll of the road, or from side to side a large road, the rotation should stop stirring until the road improved after the recovery swirled.
Ten, Time tanker transport concrete concrete batching plant can not exceed the specified time. Transporting concrete
The way, the mixing tube can not be stopped for a long time, to prevent the concrete to produce segregation phenomenon. Drivers should always observe the concrete situation, abnormal timely informed the control room, to make the application process.
XI, being transformed into the mixing tube by a reverse rotation should be first joystick in the middle position, to be stopped after the mixing tube and then put the handle lever to reverse position.
XII before discharge concrete mixing drum should be rotated at 10-12 rev / min speed for 1 minute, then nesting.
XIII, stirring means continuous operation time should not exceed 8h.
Fourth, the work is completed, the mixing tube should be cleaned inside and body, so that the remaining concrete can not stay in the barrel.
Fifth, the water level in the tank should be maintained properly. In winter parking, water tanks and water systems should be put in the net.

没有评论:

发表评论